The Weite Anti-collision System is installed on a 2,000-ton crawler crane to help a nuclear power construction project

Jun. 11, 2025

Recently, the Weite Anti-collision System was successfully applied to a 2,000-ton crawler crane in a nuclear power construction project. Through intelligent monitoring technology, the safety of crawler crane installation in complex environments has been greatly improved, providing a solid guarantee for safe production at the construction site, and effectively promoting the smooth progress of nuclear power construction projects.

 

The Weite Anti-collision System is installed on a 2,000-ton crawler crane to help a nuclear power construction project

At the nuclear power construction project site, tower cranes, crawler cranes and other large-scale mechanical equipment are densely packed, steel components and temporary facilities are intertwined, and personnel and equipment are frequently exchanged. In such a complex environment, the construction safety risk increases significantly, and any collision accident may have a serious impact on the progress of the project, personnel safety and project benefits.

The Weite Anti-collision System is installed on a 2,000-ton crawler crane to help a nuclear power construction project

The Weite collision avoidance system uses millimeter-wave radar to achieve high-precision monitoring of obstacles in complex environments. It can accurately identify small objects and quickly trigger sound and light alarms within 0.2 seconds in drone simulation tests to respond to sudden interference. It optimizes the lifting process through intelligent collaboration, improves construction efficiency by 15%-20%, and shortens the construction period. At the same time, it realizes the digitization of real-time safety monitoring data, providing strong support for scientific decision-making and traceability management.

 

The Weite anti-collision system has been successfully applied at multiple construction sites and has rich practical experience. The application of a 2,000-ton crawler crane in a nuclear power construction project has once again verified its reliability and safety under complex working conditions. In the future, Weite will continue to deepen technological innovation, optimize product performance, provide smarter and more efficient safety solutions for the engineering construction field, and help the industry develop with high quality.